Longitude 131′ Uluru

Longitude 131′ Uluru

Longitude 131′ Uluru PROJECT DETAILS Location: Longitude 131′ Uluru – Kata Tjuta Completion Date: July 2023 Size: 108.8M2 Fabric: FR900 Client: Baillie Lodges photography: Sky Skills Industries Pty Ltd installed in conjunction with MakMax Australia...
Kingston Butter Factory

Kingston Butter Factory

Kingston Butter Factory PROJECT DETAILS Location: Kingston, QLD Completion Date: June 2021 Size: 112 m² Fabric: PVC – Mehler FR900N Clinet: MakMax photography: Sky Skills Industries Pty Ltd Kingston Butter Factory The Kingston Butter Factory precinct in Logan,...
the link walkway, chadstone, victoria

the link walkway, chadstone, victoria

the link walkway, chadstone, victoria PROJECT DETAILS Location: Chadstone, VIC Completion Date: October 2019 Size: 1750 sqm Fabric: PTFE – Tenara 4T40HF Client: Vicinity Centres Photography: © Peter Bennetts installed in conjunction with MakMax Australia The...
Perth Matagarup Bridge

Perth Matagarup Bridge

Perth Matagarup Bridge PROJECT DETAILS Location: Perth WA Completion Date: 2019 Size: 400m from bank-to-bank. Fabric: The structural steel bridge was covered with Teflon-coated fabric – Chuco FGT 800 Black Client:  joint venture between Main Roads, WA, Western...
Cairns JCU Innovation Centre Facade

Cairns JCU Innovation Centre Facade

Cairns JCU Innovation Centre Facade PROJECT DETAILS Location: James Cook University, Cairns QLD Completion Date: July 2020 Size: 1370sqm Fabric: PTFE Mesh – Chukoh FGJ 412-28 Client: Wilson Architects / BESIX Watpac installed in conjunction with MakMax Australia...